Expression of Interest – Short Term Consultancy Services

  • Consultancy
  • Lusaka, Zambia
  • Applications have closed

WWF Zambia

EXPRESSION OF INTEREST

SHORT TERM CONSULTANCY SERVICES FOR PRE-FEASIBILITY STUDY FOR AN INDUSTRIAL WASTE WATER TREATMENT PLANT IN THE KAFUE FLATS

The World Wide Fund for Nature (WWF) is one of the world’s largest independent conservation organisations with a global network in over 100 countries. Our mission is to stop the degradation of the planet’s natural environment and to build a future in which humans live in harmony with nature.

Summary of consultancy

WWF Zambia Country Office is involved in freshwater conservation efforts in focal landscapes within the Zambezi River Basin. The Kafue Flats landscape is one such landscape and is one of Zambia’s most productive systems. It provides goods and services such as clean drinking water, livestock pasture, hydropower, agriculture, fisheries, and other natural resources. With increases in population and ever competing needs the landscape is in need of strategic water investment interventions that will have a net positive impact without compromising the integrity of the system. It is the hope of WWF that through initiatives such as bankable water solutions the appropriate water infrastructure investments can be made in the landscape. Against this background, a need has arisen to conduct a pre-feasibility study for an industrial waste water treatment plant that could contribute towards improving water security and planning for sustainable water investment in the landscape.

Essential Functions

Task 1. Identify stakeholders in industry, water utilities, regulators and other relevant government agencies and describe their specific roles and responsibilities.
Task 2. Conduct surveys various Government departments and industrial units while executing survey on wastewater practices, treatment facilities available or planned as well as current and future freshwater demand.
Task 3. Execute an economic and financial feasibility of setting up an industrial waste water treatment plant with detailed analysis of financing required, potential financing, CAPEX, OPEX and cost-recovery potential of such a project.
Task 4. Preliminary scoping around locations for the treatment units, nominal piping routes, and other requirements.
Task 5. Write final report with findings from surveys and data collection process.

Minimum qualification required:

  • Team composition of individuals with experience in economics, finance, waste water treatment, water governance and investment.
  • 5-10 years relevant experience in waste water treatment and finance.
  • Experience in executing pre-feasibility studies for projects in LDCs and researching the links between private sector, public funding and governance structures.

How to apply

To apply, please send the following documents: 1) Company profile detailing previous similar assignments 2) Detailed CVs of team 3) Detailed work plan and budget for work; 3) Cover letter detailing why you should be selected. Documents should be sent by email to the following address: [email protected] . Please put “Pre-feasibility study for waste water treatment plant” as the subject of your email.

Detailed terms of reference (TORs) may be requested from above mentioned email address.

Closing date: Applications close on 5th March 2019 at 18:00hrs. Kindly note that only shortlisted candidates will be contacted.